House Construction Rates in Lahore 2026

Niazi Group is the best home builder in Lahore, offering complete grey structure house construction solutions, including materials, labour, and cost.

Grey Structure Rates in Lahore

Important Notes:

  • The exact rate is quoted only after reviewing your working drawings and structural drawings.
  • Rates above are approximate for construction within Lahore city limits.
  • The standard grey structure completion timeline is 3–5 months depending on plot size and design complexity.
  • No extra charges for outside work or boundary wall construction.
  • All work is executed to A+ construction quality standards.

Grey Structure Labor Rate

PKR 400 to 550/sq ft

Grey Structure Rate per square foot

PKR 2,850 to 3,400 / sq ft

5 Marla House Grey Structure Rate

PKR 2,950 to 3,100/sq ft

10 Marla House Grey Structure Rate

PKR 2,900 to 3,050/sq ft

1 Kanal House Grey Structure Rate

PKR 3,100 to 3,300/sq ft

2 Kanal House Grey Structure Rate

PKR 4,000 to 5,300/sq ft

Niazi Group of Construction

Get a Pre-Construction Expert Consultation

Fill out your project specifications below. Our engineers will review your requirements and call you back with a detailed breakdown within 24 hours.

24H Fast CallbackEngineer contact within 24 hours
✓ Licensed EngineersEvery quote reviewed before it reaches you
Rs Transparent EstimatesNo hidden costs, clear breakdowns
First idea to the final key.

    01 Project Specifications







    02 Contact Information






    What Affects Your Grey Structure Cost

    The rates above assume a standard construction plan: a plot without excessive depth, a standard foundation (no deep piling or raft foundation needed), first-floor walls aligned with the ground floor, and a basic architectural layout without large cantilevers. Actual costs shift when any of the following apply:

    Weak soil requires a stronger foundation — raft or pile — which adds cost. Rocky or hard terrain also increases excavation expenses.

    Higher seismic or load-bearing requirements call for more steel and concrete. Misaligned floors between levels require extra beams and columns.

    Brick grade, cement and steel quality, and choice of crush/sand (e.g., Margalla crush vs. local material) all move the price up or down.

    Standard ceiling height is 10 feet; going higher increases material use. Slab thickness and additional reinforcement also add cost.

    Large open spans or cantilevered terraces and balconies need extra steel and concrete for reinforcement.

    Basements and underground water tanks require waterproofing. Heat-resistant roof treatments add to the budget.

    Additional floors mean a stronger foundation and more reinforcement lower down, increasing overall material and labor needs.

    Architect Design Charges

    Architect Design Charges

    Includes an architectural plan, structural drawings, and consultation with our design team.

    House Size Design Fee
    5 Marla
    PKR 30,000
    10 Marla
    PKR 35,000
    1 Kanal
    PKR 45,000
    Turnkey Construction Rates in Lahore

    For clients who want a complete, move-in-ready home (grey structure + finishing), turnkey construction rates in Lahore currently range from PKR 6,500 to 8,800/sqft depending on the finishing grade (standard, premium, or luxury) chosen. Niazi Group provides a fixed-price, itemized quote after reviewing your drawings and finishing preferences — no surprises at handover.

    Turnkey Construction Rates in Lahore

    Finishing Level Rate PKR/sqft, Grey + Finishing What's Included
    Economy
    PKR 5,200 – 5,800
    Local tiles, standard sanitary, basic doors/windows, single-coat paint
    Standard / Mid-range
    PKR 6,500 – 7,200
    Branded tiles, mid-range sanitary & fittings, wooden doors, textured paint
    Premium
    PKR 7,500 – 9,000
    Imported tiles, modular kitchen, branded sanitary, false ceiling, designer elevation
    Luxury
    PKR 10,000 – 15,000+
    Imported marble/tiles, high-end fittings, smart-home wiring, premium HVAC & elevation
    construction labour rates

    Material Specifications We Use

    Grey structure quality comes down to what goes into it. Niazi Group uses the following as standard and specifies exact brands and grades in your written quote before work begins:

    Steel (Rebar)

    Grade 60 steel, sourced from reputable brands (e.g., Amreli, Mughal, Ittehad, or equivalent). Checked on-site for proper markings, grade, and freedom from rust before use.

    Cement

    Branded OPC cement from established mills — no unbranded or blended substitutes used in structural elements.

    Bricks

    Awwal/A-grade bricks for load-bearing walls, sourced and inspected for size, shape, and firing quality.

    Sand & Crush

    Margalla or equivalent quality crush for concrete work; screened sand for masonry and plaster.

    Damp Proofing

    DPC applied at plinth level as standard on every project, not offered as an add-on.

    Rates by Location / Society

    Construction rates vary depending on the society due to differing bylaw requirements, approval processes, and site access. DHA and Bahria Town typically run 10–20% higher than LDA/open areas due to stricter inspection and finishing standards expected by the society.

    Area Grey Structure Rate (PKR/sqft) Notes
    DHA Lahore
    PKR 3,000 – 3,300
    Stricter approval process; structural drawings must be stamped by a registered engineer
    Bahria Town, Lahore
    PKR 2,900 – 3,200
    Society-specific material and inspection requirements
    Lake City / Etihad Town
    PKR 2,850 – 3,100
    Standard society bylaws
    LDA / Non-society areas
    PKR 2,700 – 2,950
    Fewer approval layers; rates typically lowest

    Total Cost Estimates

    Plot Size Covered Area (approx.) Grey Structure Total Turnkey Total (mid-range finishing)
    5 Marla
    2,200 – 2,700 sq ft
    PKR 65–84 Lakh
    PKR 1.4 – 1.9 Crore
    10 Marla
    3,200 – 3,500 sq ft
    PKR 93 Lakh – 1.15 Crore
    PKR 2.1 – 2.5 Crore
    1 Kanal
    5,000 – 5,500 sq ft
    PKR 1.55 – 1.8 Crore
    PKR 3.3 – 4 Crore
    construction cost per square foot

    Construction Timeline by Phase

    Phase Typical Duration
    Approvals & drawing finalization
    2 – 4 weeks
    Excavation & foundation
    2 – 3 weeks
    Ground floor structure & roof slab
    4 – 6 weeks
    First-floor structure (if applicable)
    4 – 6 weeks
    Boundary wall & grey structure finishing
    2 – 3 weeks
    Total grey structure (5–10 marla)
    3 – 5 months
    Total grey structure (1 Kanal)
    5 – 7 months
    Finishing work (turnkey)
    Additional 2–4 months

    What to Check Before You Sign a Contract

    Verbal estimates and vague quotes are the most common source of disputes on construction sites in Lahore. Before signing with any builder, insist on:

    • A written, itemized quote with material brands, steel grade, and cement brand specified — not just a per-sqft number.
    • A stage-wise payment schedule tied to physically completed and verified work.
    • A fixed timeline with clear responsibility for delays.
    • Written confirmation of who handles society approvals, inspections, and any related fines.
    • A price-lock clause, or clarity on how material price fluctuations are handled mid-project.
    • At least three quotes from different contractors before deciding—a rate significantly below the market band usually means thinner steel, unbranded cement, or exclusions (boundary wall, water tank, plaster) that surface later as “extras”.

    Planning to build your dream home in Lahore? Contact Niazi Group today for a personalized house construction estimate and start your project with a clear budget and professional construction planning.