Construction Cost in Lahore 2026: Per Sq Ft Rates for Grey Structure & Turnkey

Niazi Group is the best home builder in Lahore, offering complete grey structure house construction solutions, including materials, labour, and cost.

Key Takeaway

  • Grey structure (with material): Rs 2,800 to 3,400 per sq ft of covered area, depending on society, plot size and design.
  • Lahore rate per square foot: Rs 550 to 600 per sq ft.
  • Turnkey (grey + finishing): Rs 6,500 to 8,800 per sq ft for economy, standard and premium finishing Rs 10,000 to 15,000+ for luxury.
  • 5 Marla houses: roughly Rs 60–70 lakh for the grey structure and Rs 1.4–1.9 crore for turnkey (mid-range finishing).
  • Time: 3–5 months for a grey structure on 5–10 marlas.
  • Exact price: quoted after we review your working and structural drawings.

Grey Structure Labor Rate

PKR 550 to 600/sq ft

Grey Structure Rate per square foot

PKR 2,800 to 3,400 / sq ft

5 Marla House Grey Structure Rate

PKR 3,000 to 3,300/sq ft

10 Marla House Grey Structure Rate

PKR 2,900 to 3,050/sq ft

1 Kanal House Grey Structure Rate

PKR 3,300 to 3,500/sq ft

2 Kanal House Grey Structure Rate

Custom Quote

Per Square Feet Construction Cost in Lahore Pakistan

Construction cost in Lahore is charged per square foot of covered area: every floor added together, including the stair tower (mumty) and any basement. The rates below are for construction within Lahore city limits and cover construction only. Land, approvals, utility connections and furniture are extra.

Construction type

Cost per sq ft

Grey structure, labour only

PKR 550 – 600

Grey structure, with material

PKR 2,800 – 3,400

Economy Grey Structure

PKR 2,800–3,000

Standard Grey Structure

PKR 3,000–3,300

Premium Grey Structure

PKR 3,300–3,500+

Turnkey – Economy

PKR 5,800 – 6,200

Turnkey – Standard / Mid-range

PKR 6,500 – 7,200

Turnkey – Premium

PKR 7,500 – 8,800

Turnkey – Luxury

PKR 10,000 – 15,000+

Important Note: Turnkey rates include the grey structure. The exact rate depends on your drawings, finishing choices and brands, which is why we give a written, itemized quote rather than a single headline number.

Labour Rate Per Sq Ft in Lahore

Most houses in Lahore are built on one of two contract types.

  • Labour-only contract (theka): You buy the material and the thekedar supplies the labour. Our grey structure labour rate is about Rs 550 to 600 per sq ft.
  • With-material (turnkey) contract: The contractor buys everything and quotes one all-in rate per sq ft. This is the contract our rates above are based on, and it gives you one point of responsibility for quality, timeline and price.

Grey Structure Rate in Lahore

Our grey structure covers the foundation, columns, beams, roof slabs, brick walls, plaster and the pipes and conduits laid inside them. Our grey structure rates in Lahore use standard A+ grade material: Grade 60 steel, branded OPC cement, Awwal bricks, ravi sand and Sargodha crush.

  • Grey Labour Rate: Rs 400–550 / sq ft
  • Economy Grey Structure: Rs 2,800–3,000 / sq ft
  • Standard Grey Structure: Rs 3,000–3,300 / sq ft
  • A+ / Premium Grey Structure: Rs 3,300–3,500+/sq ft

Turnkey Construction Rates in Lahore

Turnkey Construction Rates in Lahore

For clients who want a complete, move-in-ready home (grey structure + finishing), turnkey construction rates in Lahore currently range from PKR 6,500 to 8,800/sqft depending on the finishing grade (standard, premium, or luxury) chosen. Niazi Group provides a fixed-price, itemized quote after reviewing your drawings and finishing preferences — no surprises at handover.

Finishing Level Rate PKR/sqft, Grey + Finishing What's Included
Turnkey Economy
PKR 5,800 – 6,200
Local tiles, standard sanitary, basic doors/windows, single-coat paint
Turnkey Standard
PKR 6,500 – 7,200
Branded tiles, mid-range sanitary & fittings, wooden doors, textured paint
Turnkey Premium
PKR 6,700 – 8,800
Imported tiles, modular kitchen, branded sanitary, false ceiling, designer elevation
Turnkey Luxury
PKR 10,000 – 15,000+
Imported marble/tiles, high-end fittings, smart-home wiring, premium HVAC & elevation

Construction Cost Per Marla in Lahore

The construction cost per marla falls as the plot gets bigger and the location. A small plot packs more covered area, bathrooms and stairs onto each marla, while a larger house spreads its foundation and fixed costs over more land.

Plot size

Grey structure per marla

Turnkey per marla (mid-range)

5 Marla

Rs 13 – 17 lakh

Rs 28 – 38 lakh

10 Marla

Rs 9 – 11 lakh

Rs 21 – 25 lakh

1 Kanal (20 marla)

Rs 7.8 – 9 lakh

Rs 16.5 – 20 lakh

Important Note: So when you quote a single “per marla” rate, ask which plot size and covered area it assumes.

Construction Cost by Plot Size in Lahore

These are standard double-storey houses. Covered area depends on your plot, your society’s bylaws and your design.

Plot size

Covered area (approx.)

Grey structure total

5 Marla

PKR 2,800 – 3,400 sq ft

Rs 60 – 70 lakh

10 Marla

PKR 3,200 – 3,500 sq ft

Rs 1.05 – 1.15 crore

1 Kanal

PKR 5,400 – 5,800 sq ft

Rs 1.70 – 1.8 crore

2 Kanal

Custom Quote

Quoted after drawings

Grey structure totals use our per sq ft rate for each size: 5 marla Rs 2,800–3,400, 10 marla Rs 3,200–3,500 and 1 kanal Rs 5,400–5,800. Turnkey totals use our mid-range finishing rate of Rs 6,500–8,800.

Construction Rates by Society in Lahore

Construction rates vary depending on the society due to differing bylaw requirements, approval processes, and site access. DHA and Bahria Town typically run 10–20% higher than LDA/open areas due to stricter inspection and finishing standards expected by the society.

  • DHA Lahore: PKR 3,000 – 3,500 per sq ft
  • Bahria Town, Lahore: PKR 2,900 – 3,300 per sq ft
  • Lake City Lahore: PKR 2,950 – 3,200 per sq ft
  • Park View City Lahore: PKR 2,800 – 3,500 per sq ft
  • Etihad Town Lahore: PKR 2,800 – 3,500 per sq ft
  • LDA / non-society areas: PKR 2,800 – 3,400 per sq ft
  •  

Architect Design Charges

Includes an architectural plan, structural drawings, and consultation with our design team.

House Size Design Fee
5 Marla
PKR 30,000
10 Marla
PKR 35,000
1 Kanal
PKR 45,000

Total House Construction Cost Estimates

Plot Size Covered Area (approx.) Grey Structure Total Turnkey Total (mid-range finishing)
5 Marla
2,200 – 2,700 sq ft
PKR 60–70 Lakh
PKR 1.4 – 1.9 Crore
10 Marla
3,200 – 3,500 sq ft
PKR 1.05 – 1.15 Crore
PKR 2.1 – 2.5 Crore
1 Kanal
5,000 – 5,500 sq ft
PKR 1.70 – 1.80 Crore
PKR 3.3 – 4 Crore

Approval and Other Costs Not Included in the Rate

Construction rates do not include the following. Budget for them separately:

  • Plot and transfer costs.
  • Approval charges: building plan scrutiny fee from LDA or your society, plus WASA, FBR and malba charges. ⚠ [Add the current LDA per sq ft fee after verifying it with LDA.]
  • Utility connections: electricity, gas and water connection charges and meters.
  • Basement: priced higher than the standard rate because of retaining walls, extra steel and waterproofing.
  • Solar, air conditioners, appliances and furniture.
  • Contingency: keep about 10% of the construction budget aside for price changes and design changes.

Material Specifications We Use

construction labour rates

Grey structure quality comes down to what goes into it. Niazi Group uses the following as standard and specifies exact brands and grades in your written quote before work begins:

Steel (Rebar)

Grade 60 steel, sourced from reputable brands (e.g., Amreli, Mughal, Ittehad, or equivalent). Checked on-site for proper markings, grade, and freedom from rust before use.

Cement

Branded OPC cement from established mills — no unbranded or blended substitutes used in structural elements.

Bricks

Awwal/A-grade bricks for load-bearing walls, sourced and inspected for size, shape, and firing quality.

Sand & Crush

Margalla or equivalent quality crush for concrete work; screened sand for masonry and plaster.

Damp Proofing

DPC applied at plinth level as standard on every project, not offered as an add-on.

Construction Timeline by Phase

construction cost per square foot
Phase Typical Duration
Approvals & drawing finalization
2 – 4 weeks
Excavation & foundation
2 – 3 weeks
Ground floor structure & roof slab
4 – 6 weeks
First-floor structure (if applicable)
4 – 6 weeks
Boundary wall & grey structure finishing
2 – 3 weeks
Total grey structure (5–10 marla)
3 – 5 months
Total grey structure (1 Kanal)
5 – 7 months
Finishing work (turnkey)
Additional 2–4 months

What Affects Your Grey Structure Cost

The rates above assume a standard construction plan: a plot without excessive depth, a standard foundation (no deep piling or raft foundation needed), first-floor walls aligned with the ground floor, and a basic architectural layout without large cantilevers. Actual costs shift when any of the following apply:

Weak soil requires a stronger foundation — raft or pile — which adds cost. Rocky or hard terrain also increases excavation expenses.

Higher seismic or load-bearing requirements call for more steel and concrete. Misaligned floors between levels require extra beams and columns.

Brick grade, cement and steel quality, and choice of crush/sand (e.g., Margalla crush vs. local material) all move the price up or down.

Standard ceiling height is 10 feet; going higher increases material use. Slab thickness and additional reinforcement also add cost.

Large open spans or cantilevered terraces and balconies need extra steel and concrete for reinforcement.

Basements and underground water tanks require waterproofing. Heat-resistant roof treatments add to the budget.

Additional floors mean a stronger foundation and more reinforcement lower down, increasing overall material and labor needs.

What to Check Before You Sign a Contract

Verbal estimates and vague quotes are the most common source of disputes on construction sites in Lahore. Before signing with any builder, insist on:

  • A written, itemized quote with material brands, steel grade, and cement brand specified — not just a per-sqft number.
  • A stage-wise payment schedule tied to physically completed and verified work.
  • A fixed timeline with clear responsibility for delays.
  • Written confirmation of who handles society approvals, inspections, and any related fines.
  • A price-lock clause, or clarity on how material price fluctuations are handled mid-project.
  • At least three quotes from different contractors before deciding—a rate significantly below the market band usually means thinner steel, unbranded cement, or exclusions (boundary wall, water tank, plaster) that surface later as “extras”.